2019年7月31日星期三

Master bathroom DWV layout

I'm planning on adding a double sink vanity, shower, and toilet to my upstairs to complete a master suite. In planning a previous bathroom layout I recall reading somewhere about a preferred method for tying toilet drains in to the DWV system relative to where the shower and sinks tye in.

Is there a recommended location the shower and sink drains should tie into the main stack? Before or after the toilet? Should the toilet be the last tip of the branch? Or closest to the main stack?

submitted by /u/BlastFist
[link] [comments]

from DIY https://ift.tt/2Mwahnw

没有评论:

发表评论